FLYVANS.COM
Search:   
       
  

30.09.2005 QB Wings
13.09.2005 QB Kit Delivery!
27.08.2005 Empennage tip fairings continued / Wing cradle
20.07.2005 Empennage tip fairings
02.07.2005 Adjusting control surface eye-bolts / Starting tip fairings.
17.06.2005 Leading edge rolling / Motivation ;-)
14.06.2005 Elevators / Trim Tab
06.06.2005 Riveting the elevators
31.05.2005 Riveting the rudder trailing edge
23.05.2005 Riveting the rudder / Sealed rudder trailing edge
21.05.2005 Riveting the rudder
17.05.2005 Finished HS and VS
14.05.2005 Trim servo mount
13.05.2005 Elevators deburred
10.05.2005 Elevators built up
07.05.2005 Trimming the E-714 right elevator counterweight
06.05.2005 Riveting trim reinforcement plate
29.04.2005 Riveting elevator stiffeners
27.04.2005 Elevator understructure
25.04.2005 Empennage kit closing inspection
20.04.2005 Elevator stiffeners
17.04.2005 HS ready for inspection / Emp storage cart
13.04.2005 Riveting HS and rudder
12.04.2005 Riveting HS and rudder understructure
05.04.2005 Priming HS and rudder parts
21.03.2005 Dimpling the top rudder rib R-903
10.03.2005 Dimpling the rudder and HS parts
24.02.2005 Prepping the rudder
22.02.2005 Rudder buildup
14.02.2005 Riveting rudder stiffeners
Page 4 of 5   
- © 2005-2025 by Daenzer/Lichtensteiger  |  Disclaimer

BUILDERS LOG