FLYVANS.COM
Search:   
       
  

30.06.2006 Aileron Pushrod Boots / Canopy Rollbar
25.06.2006 Beginning of fuel system construction
15.05.2006 Interior & Center Console 2
10.05.2006 Interior & Center Console 1
22.04.2006 Fuselage / Sealing
16.04.2006 Various Fuselage Tasks
04.04.2006 Finish Kit Delivery
29.03.2006 Fuselage
21.03.2006 Fuselage / main gear weldments
06.03.2006 Fuselage / Autopilot pitch servo
22.02.2006 Fuselage / Steps installed
16.02.2006 Fuselage / Step install
26.01.2006 Fuselage
21.01.2006 Rudder Pedals
15.01.2006 Cabin Floor Access
15.01.2006 Aileron Trim
14.01.2006 Fuselage work started
08.01.2006 Wings
28.12.2005 Wingtips
03.12.2005 Closing the left wing / Flap installation
24.11.2005 Closing the right wing / Flap installation
20.11.2005 Wings
06.11.2005 Ailerons
06.11.2005 QB Wings / AOA ports
06.11.2005 Landing Light completed
31.10.2005 QB Wings / Landing Light
31.10.2005 QB Wings / Wiring conduits
25.10.2005 QB Wings / Wiring conduits
12.10.2005 QB Wings / Pitot Mount
03.10.2005 QB Wings continued
Page 3 of 5   
- © 2005-2025 by Daenzer/Lichtensteiger  |  Disclaimer

BUILDERS LOG