FLYVANS.COM
Search:   
       
  

16.02.2008 Canopy Frame weatherstripping
13.02.2008 Canopy Frame continued
30.01.2008 Canopy Frame
24.12.2007 Rudder Pedals again revisited
12.12.2007 Canopy Latch
08.11.2007 Interior Paint
08.10.2007 Canopy hinge blocks
27.09.2007 Front Deck
03.09.2007 Wingtips almost done
21.08.2007 Reworking Fuel Pump Package
20.08.2007 Wingtips
10.08.2007 Empennage Fairings
06.08.2007 Mounting the rollbar
20.06.2007 Mounting the Vertical Stabilizer / Air Vents
31.01.2007 Mounting the Vertical Stabilizer
06.12.2006 Mounting the Horizontal Stabilizer
01.12.2006 Fuel Pump Package support
28.11.2006 Ailerons rigged to Control Stick
27.11.2006 Reassembled Rudder Pedals
22.11.2006 Flap pushrods
10.11.2006 Wing attach work
19.10.2006 Just married: wings attached!
17.10.2006 Center fuse fuel lines
16.10.2006 Wrapping up fuel tanks 2
14.10.2006 Wrapping up fuel tanks
24.09.2006 AFP Fuel pump assembly
04.09.2006 Fuselage top skin
30.07.2006 Fuselage rollover bar
20.07.2006 Vent screens / Crotch strap brackets
08.07.2006 First Interior Painting Experiences
Page 2 of 5   
- © 2005-2025 by Daenzer/Lichtensteiger  |  Disclaimer

BUILDERS LOG